Plasterboard partition walls

New layouts for homes and workspaces, using framing, boards and details specified for the project.

Call us: 0888 39 49 49
Photo provided: plasterboard construction and sheathing
Supplied real photo from the work process

THE BASIS FOR A GOOD RESULT

About the service

The partition wall divides the space by combining metal construction and plasterboard cladding. Before work, we specify the height, door openings, places for installations and the way of connection to the existing surfaces.

The number and type of boards, profiles and insulation filling are selected as a compatible system. Heavy objects and future furniture must be foreseen during construction to specify the necessary reinforcements.

Joints, connections and installation transitions are part of the whole solution. Sound and fire resistance characteristics are determined by the design system; we do not derive them only from the type of individual board or mineral wool.

Materials and preparation

Before construction, we specify the height, door openings and installation locations. The future cupboards and busy areas are foreseen already in the construction.

The system determines the profiles, the number of panels and the filling. We specify the connections to the existing surfaces and the necessary reinforcements.

Why careful preparation matters

The partition position affects usable space, door openings and connections to the ceiling and floor. Agreeing these details beforehand avoids rework after the boards are installed. Insulation, joints and perimeter connections follow the selected system. Sound insulation and fire resistance cannot be promised on the basis of the board type alone: the required solution is determined for the complete assembly and the specific project.

FROM PREPARATION TO COMPLETION

How the work proceeds

  1. We specify the dimensions, the condition of the project and the design details.

  2. We prepare the structure and the necessary openings according to the selected system.

  3. We install the boards and shape the connections and details.

  4. We process the joints and discuss the next finishing stages.

APPLICATIONS

Suitable for your project

  • Dwellings
  • Offices
  • Reconstruction of premises

Enquiries about projects in different parts of Bulgaria are discussed individually according to scope, location and schedule.

Photo provided: detail of plasterboard work
Supplied real photo from the work process

BEFORE WE BEGIN

Frequently asked questions

Can the wall have insulation infill?

Yes, when provided for in the selected solution. The type, thickness and installation agree with the construction.

When to specify cabinet locations?

Before closing the structure to plan the necessary details and reinforcements.

MATERIALS FOR THIS STAGE

An informed choice

Knauf materials ↗

Sample products and manufacturer's instructions. The specific system is specified for the project.

RELATED SERVICES

Continue to the next stage

Preparation and final coating are planned together according to the condition of the surfaces.

Images illustrating plastering, skim coating and painting are conceptual visualisations. The plasterboard photos are real.

FOR YOUR PROJECT

Let’s discuss the next stage.

Enquiries about projects in different parts of Bulgaria are discussed individually according to scope, location and schedule.

Have the location, approximate area, current condition and preferred timing ready.

Call us: 0888 39 49 49
Call us: 0888 39 49 49