PLAN YOUR NEXT STAGE
Guidance for your renovation
Materials have different roles. These guides help you ask the right questions about basis, amounts, and sequencing.
Consumption rates: planning material quantities
Area, thickness, number of coats and substrate type: the four starting points for a useful material estimate.
Read the guide ↗Working temperatures and material drying
Air, substrate and material temperature are considered together with humidity and layer thickness.
Read the guide ↗From plasterboard to paint: the sequence of work
Jointing, finishing putty, sanding, primer and paint — separate stages with different tasks.
Read the guide ↗Boards, profiles and insulation: choosing a complete system
A wall or ceiling is defined by the working together of components and assembly details.
Read the guide ↗Tapes, screws, hangers and plasterboard accessories
Small components form important connections within the construction. They are selected as part of the system together with the boards and profiles.
Read the guide ↗FOR YOUR PROJECT
Let’s discuss the next stage.
Enquiries about projects in different parts of Bulgaria are discussed individually according to scope, location and schedule.
Have the location, approximate area, current condition and preferred timing ready.