Where it is used
In the Uniflott system, it is used after the main filling of the joints. It can also be involved in complete finishing of walls and ceilings.
The consumption per linear meter of joint and that per square meter of surface are different indicators. They are separated in the table.
System and application
Joint treatment and overall skim coating are different steps in the surface finishing system.
Knauf jointing and finishing compounds ↗Application method
- Check the dryness and stability of the base.
- Homogenize the finished mixture and apply a suitable thin layer.
- Allow to dry and finish treatment before painting.
This is a brief guide. When performing, follow the data sheet, safety instructions and the specific system.
Limitations and application notes
The finishing layer does not replace the main filling of the joints. The consumption per linear meter of joint and the consumption per square meter of putty are not interchangeable.
Frequently asked questions
Can this material be replaced with another from the same group?
Replacement is assessed according to the basis, purpose and system. The exact data sheets are compared, not just the band name.
Is the specified consumption sufficient for an order?
The norm is a starting point under the specified conditions. For the project, the actual area or length, layers, cut and losses are specified; for wet mixtures, a trial application is made.